Utorogu
Utorogu

NNPC
construction of Utorogu well 10 drilling Project

construction of Utorogu well 10 drilling locations at Utorogu field of OML 34.
  • Site Clearing
  • Sand filling/stabilization to make up levels
  • Construction of rigid pavements
  • Construction of waste, bunker & saver pits
  • Fencing of the location
  • Construction of chemical shed & perimeter fence
  • Construction of cellar pit & cellar slab
  • Drilling of water holes & Reconstruction of access road.

Our Mission

Our mission is to secure community freedom-to-operate, mobilize safely, and transform the OML34 site into a world-class, regulation-ready facility. We will clear, level, and prepare the ground with precision, removing legacy structures and unsuitable soils. From foundations to containment, we will build every pit, tank, slab, and shelter to exacting safety and environmental standards. We will erect secure perimeter, drainage, and support systems that protect people, equipment, and the environment. Delivered on time, our turnkey site will stand ready for seamless oilfield operations and future expansion.
Site Mobilization & Clearing
Clear bush with bulldozers, chainsaws, pay loaders, tippers; cart or push debris to designated vacant area.
Site Mobilization & Clearing
Clear bush with bulldozers
Debris pushed to designated vacant area

Earthworks
Strip unsuitable topsoil to ≈350 mm depth, Remove abandoned Earth-Saver Pits.
Strip unsuitable topsoil to ≈350 mm depth.
Chainsaw for excavation/haulage.
Remove abandoned Earth-Saver Pits
Site Inspection
Site Inspection
Site Inspection
Site Inspection

Gets an Quotation For
Your Industry

Call us Now +234-812-231-6271




REGIONs
Address
13A Sola Oguntade Closes, Lekki Phase1, Lagos
Email Address
info@regionsoilandgas.com
Phone
Office: +234-812-231-6271