Site Mobilization & Clearing
Bush clearing with bulldozers, chainsaws, pay-loaders and tippers — debris carted or pushed to a designated vacant area to open the OML 34 footprint.






Featured Project · NNPC
Construction of the Utorogu Well 10 drilling location at the Utorogu Field of OML 34 — a turnkey civil scope from clearing to handover.
Location
Utorogu Field, OML 34 — Nigeria
Client
NNPC / NPDC Joint Venture
Scope
Turnkey drilling location construction
Our Mission
Our mission is to secure community freedom-to-operate, mobilize safely, and transform the OML 34 site into a world-class, regulation-ready facility. We clear, level and prepare the ground with precision, removing legacy structures and unsuitable soils.
From foundations to containment, we build every pit, tank, slab and shelter to exacting safety and environmental standards. Secure perimeter, drainage and support systems protect people, equipment and the environment.
Delivered on time, our turnkey site stands ready for seamless oilfield operations and future expansion.
Scope of Work
The Construction Sequence
A staged delivery model — protecting schedule, quality and the people and environment around the OML 34 footprint.
Bush clearing with bulldozers, chainsaws, pay-loaders and tippers — debris carted or pushed to a designated vacant area to open the OML 34 footprint.






Sand filling and compaction to make up levels, removing unsuitable soils and producing a stable, regulation-ready ground formation.






Construction of heavy-duty rigid pavements engineered to carry drilling rigs, mud pumps and oilfield logistics traffic without deformation.






Excavation and construction of waste pits, bunker pits and saver pits — containment built to environmental and HSE standards.






Reinforced chemical shed, perimeter security fencing and gating — protecting people, equipment and the surrounding community.






Precision cellar pit excavation and reinforced cellar slab — the structural foundation for safe wellhead operations.






Drilling of supply water holes and reconstruction of access roads — closing out a turnkey site ready for seamless oilfield operations.







On-site Footage
Get a Quotation