Featured Project · NNPC

NNPC Utorogu Well 10 Drilling Location

Construction of the Utorogu Well 10 drilling location at the Utorogu Field of OML 34 — a turnkey civil scope from clearing to handover.

Location

Utorogu Field, OML 34 — Nigeria

Client

NNPC / NPDC Joint Venture

Scope

Turnkey drilling location construction

Our Mission

A world-class, regulation-ready drilling location — delivered turnkey.

Our mission is to secure community freedom-to-operate, mobilize safely, and transform the OML 34 site into a world-class, regulation-ready facility. We clear, level and prepare the ground with precision, removing legacy structures and unsuitable soils.

From foundations to containment, we build every pit, tank, slab and shelter to exacting safety and environmental standards. Secure perimeter, drainage and support systems protect people, equipment and the environment.

Delivered on time, our turnkey site stands ready for seamless oilfield operations and future expansion.

NUPRC HSE ISO 9001 Community-First

Scope of Work

What we built at Utorogu Well 10

  • Site clearing & mobilization
  • Sand filling / stabilization to level
  • Construction of rigid pavements
  • Waste, bunker & saver pits
  • Perimeter fencing of the location
  • Chemical shed & perimeter fence
  • Cellar pit & cellar slab
  • Drilling of water holes
  • Reconstruction of access road

The Construction Sequence

From bush clearing to handover

A staged delivery model — protecting schedule, quality and the people and environment around the OML 34 footprint.

Stage 01

Site Mobilization & Clearing

Bush clearing with bulldozers, chainsaws, pay-loaders and tippers — debris carted or pushed to a designated vacant area to open the OML 34 footprint.

Site Mobilization & Clearing — utorogu-01.jpg
Site Mobilization & Clearing — utorogu-02.jpg
Site Mobilization & Clearing — utorogu-03.jpg
Site Mobilization & Clearing — utorogu-04.jpg
Site Mobilization & Clearing — utorogu-05.jpg
Site Mobilization & Clearing — utorogu-06.jpg
Stage 02

Sand Filling & Stabilization

Sand filling and compaction to make up levels, removing unsuitable soils and producing a stable, regulation-ready ground formation.

Sand Filling & Stabilization — utorogu-07.jpg
Sand Filling & Stabilization — utorogu-08.jpg
Sand Filling & Stabilization — utorogu-09.jpg
Sand Filling & Stabilization — utorogu-10.jpg
Sand Filling & Stabilization — utorogu-11.jpg
Sand Filling & Stabilization — utorogu-12.jpg
Stage 03

Rigid Pavements

Construction of heavy-duty rigid pavements engineered to carry drilling rigs, mud pumps and oilfield logistics traffic without deformation.

Rigid Pavements — utorogu-13.jpg
Rigid Pavements — utorogu-14.jpg
Rigid Pavements — utorogu-15.jpg
Rigid Pavements — utorogu-16.jpg
Rigid Pavements — utorogu-17.jpg
Rigid Pavements — utorogu-18.jpg
Stage 04

Pits & Containment

Excavation and construction of waste pits, bunker pits and saver pits — containment built to environmental and HSE standards.

Pits & Containment — utorogu-19.jpg
Pits & Containment — utorogu-20.jpg
Pits & Containment — utorogu-21.jpg
Pits & Containment — utorogu-22.jpg
Pits & Containment — utorogu-23.jpg
Pits & Containment — utorogu-24.jpg
Stage 05

Chemical Shed & Perimeter Fence

Reinforced chemical shed, perimeter security fencing and gating — protecting people, equipment and the surrounding community.

Chemical Shed & Perimeter Fence — utorogu-25.jpg
Chemical Shed & Perimeter Fence — utorogu-26.jpg
Chemical Shed & Perimeter Fence — utorogu-27.jpg
Chemical Shed & Perimeter Fence — utorogu-28.jpg
Chemical Shed & Perimeter Fence — utorogu-29.jpg
Chemical Shed & Perimeter Fence — utorogu-30.jpg
Stage 06

Cellar Pit & Cellar Slab

Precision cellar pit excavation and reinforced cellar slab — the structural foundation for safe wellhead operations.

Cellar Pit & Cellar Slab — utorogu-31.jpg
Cellar Pit & Cellar Slab — utorogu-32.jpg
Cellar Pit & Cellar Slab — utorogu-33.jpg
Cellar Pit & Cellar Slab — utorogu-34.jpg
Cellar Pit & Cellar Slab — utorogu-35.jpg
Cellar Pit & Cellar Slab — utorogu-36.jpg
Stage 07

Water Holes & Access Road

Drilling of supply water holes and reconstruction of access roads — closing out a turnkey site ready for seamless oilfield operations.

Water Holes & Access Road — utorogu-37.jpg
Water Holes & Access Road — utorogu-38.jpg
Water Holes & Access Road — utorogu-39.jpg
Water Holes & Access Road — utorogu-40.jpg
Water Holes & Access Road — utorogu-41.jpg
Water Holes & Access Road — utorogu-42.jpg
Water Holes & Access Road — utorogu-43.jpg

On-site Footage

Construction in motion

Project Gallery

43 field photographs

OML 34 — Utorogu Well 10 Drilling Location
utorogu-01.jpg
utorogu-02.jpg
utorogu-03.jpg
utorogu-04.jpg
utorogu-05.jpg
utorogu-06.jpg
utorogu-07.jpg
utorogu-08.jpg
utorogu-09.jpg
utorogu-10.jpg
utorogu-11.jpg
utorogu-12.jpg
utorogu-13.jpg
utorogu-14.jpg
utorogu-15.jpg
utorogu-16.jpg
utorogu-17.jpg
utorogu-18.jpg
utorogu-19.jpg
utorogu-20.jpg
utorogu-21.jpg
utorogu-22.jpg
utorogu-23.jpg
utorogu-24.jpg
utorogu-25.jpg
utorogu-26.jpg
utorogu-27.jpg
utorogu-28.jpg
utorogu-29.jpg
utorogu-30.jpg
utorogu-31.jpg
utorogu-32.jpg
utorogu-33.jpg
utorogu-34.jpg
utorogu-35.jpg
utorogu-36.jpg
utorogu-37.jpg
utorogu-38.jpg
utorogu-39.jpg
utorogu-40.jpg
utorogu-41.jpg
utorogu-42.jpg
utorogu-43.jpg